One cubic yard of concrete is 27 cubic feet. To turn that into bags, divide by the yield printed on the bag. Standard concrete mix yields about 0.30 cu ft per 40 lb bag, 0.375 per 50 lb, 0.45 per 60 lb and 0.60 per 80 lb. If you are filling form tubes, the Sonotube concrete calculator does this for every bag size at once.
Bags per cubic yard
| Bag size | Yield per bag | Bags per cubic yard |
|---|---|---|
| 40 lb | 0.30 cu ft | 90 |
| 50 lb | 0.375 cu ft | 72 |
| 60 lb | 0.45 cu ft | 60 |
| 80 lb | 0.60 cu ft | 45 |
High-strength and fast-setting mixes can yield a little more or less. The bag lists its own yield, so check it before you load the cart.
Bags for other amounts
Rounded up, no waste added:
| Cubic yards | Cubic feet | 40 lb | 50 lb | 60 lb | 80 lb |
|---|---|---|---|---|---|
| 0.25 | 6.75 | 23 | 18 | 15 | 12 |
| 0.5 | 13.5 | 45 | 36 | 30 | 23 |
| 1 | 27 | 90 | 72 | 60 | 45 |
| 1.5 | 40.5 | 135 | 108 | 90 | 68 |
| 2 | 54 | 180 | 144 | 120 | 90 |
| 3 | 81 | 270 | 216 | 180 | 135 |
How to work it out yourself
- Find the volume in cubic feet. For a slab, length × width × thickness, all in feet. For a round tube, 3.1416 × (diameter in inches ÷ 24)² × height in feet.
- Divide by 27 if you want cubic yards.
- Divide cubic feet by the bag yield and round up.
- Add 5 to 10% for spills, uneven holes and the bag that splits.
Example: six 12 inch Sonotubes, 4 ft each. One tube holds 3.14 cu ft, six hold 18.85 cu ft (0.70 cu yd). With 10% waste that is 20.73 cu ft, so 35 bags of 80 lb. Open this example in the calculator.
When a truck makes more sense
At 45 bags, one yard of bagged concrete is 3,600 lb of dry mix, more than a full pallet of 80 lb bags (42 per pallet, see bags on a pallet). It is also a long day with a mixer.
Ready-mix suppliers usually sell by the quarter or half yard, with a minimum order and a short-load fee for small jobs. A rough guide:
- Under about half a yard: bags almost always win.
- Half a yard to a yard and a half: price both, including the fee.
- Over a yard and a half: a truck usually wins on cost and on your back, if it can reach the pour.
Enter your bag price, the yard price and the short-load fee in step 3 of the calculator and it tells you which is cheaper for your job. It rounds the truck order up to the nearest quarter yard.
Weight check
Concrete weighs about 150 lb per cubic foot wet, so a yard is around 4,000 lb. That is far beyond what most pickups are rated to carry, so plan several trips or delivery if you buy a yard of bags.
Bags for a small slab
Slabs are the other common bagged-concrete job. For a 4 inch thick slab, volume = length × width ÷ 3 (in cubic feet). Rounded up, no waste:
| Slab, 4 in thick | Concrete | Cubic yards | 60 lb bags | 80 lb bags |
|---|---|---|---|---|
| 4 × 4 ft landing | 5.33 cu ft | 0.20 | 12 | 9 |
| 8 × 8 ft pad | 21.33 cu ft | 0.79 | 48 | 36 |
| 10 × 10 ft pad | 33.33 cu ft | 1.23 | 75 | 56 |
| 12 × 12 ft pad | 48.00 cu ft | 1.78 | 107 | 80 |
Past about 8 × 8 ft, a slab is more concrete than most people want to mix by hand in one session, and a slab needs to be placed and finished before it starts to set.
Ordering ready-mix: what to ask
If the numbers point to a truck, call two or three local suppliers and ask:
- What is your minimum order, and do you sell by the quarter yard?
- What is the short-load fee below a full load?
- How much time do I get to unload before extra charges start?
- Can the truck reach the pour, or do I need a wheelbarrow crew or a pump?
- What strength mix do you recommend for footings, and does my plan call for one?
Give them the volume from the calculator with waste included, rounded up to the next quarter yard.
Common mistakes
- Forgetting waste. Holes are rarely perfect cylinders. 5 to 10% extra covers it.
- Mixing yields. Fast-setting and high-strength mixes can list a different yield than standard mix. Use the number on the bag you buy.
- Rounding too early. Work out the whole job in cubic feet, then convert to bags once, so small roundings do not add up.
- Buying the exact count. One split bag leaves a footing short. Buy one or two spare and return them unopened if the store allows it.
Going the other way: bags to yards
If you already have bags and want to know how much concrete they make, multiply by the yield and divide by 27. Thirty 80 lb bags make 18 cu ft, which is two thirds of a yard. Thirty 60 lb bags make 13.5 cu ft, half a yard. Fifty 40 lb bags make 15 cu ft, about 0.56 yards. This is handy when you have leftover bags from an earlier job and want to know whether they cover the next one.
More on bag sizes: 40 vs 50 vs 60 vs 80 lb bags and how many cubic feet in an 80 lb bag.