Skip to content

How Many Bags of Concrete in a Yard? (40, 50, 60 and 80 lb)

By Updated 5 min read

Line drawing illustrating how many 80lb bags of concrete in a yard

Quick answer

One cubic yard is 27 cubic feet. An 80 lb bag of concrete mix yields about 0.60 cu ft, so a yard takes 45 bags. With 60 lb bags (0.45 cu ft) it takes 60 bags, with 50 lb bags 72, and with 40 lb bags 90. Add 5 to 10% for waste before you buy.

1 cubic yard
27 cu ft
80 lb bags per yard
45
60 lb bags per yard
60

One cubic yard of concrete is 27 cubic feet. To turn that into bags, divide by the yield printed on the bag. Standard concrete mix yields about 0.30 cu ft per 40 lb bag, 0.375 per 50 lb, 0.45 per 60 lb and 0.60 per 80 lb. If you are filling form tubes, the Sonotube concrete calculator does this for every bag size at once.

Bags per cubic yard

Bag size Yield per bag Bags per cubic yard
40 lb 0.30 cu ft 90
50 lb 0.375 cu ft 72
60 lb 0.45 cu ft 60
80 lb 0.60 cu ft 45

High-strength and fast-setting mixes can yield a little more or less. The bag lists its own yield, so check it before you load the cart.

Bags for other amounts

Rounded up, no waste added:

Cubic yards Cubic feet 40 lb 50 lb 60 lb 80 lb
0.25 6.75 23 18 15 12
0.5 13.5 45 36 30 23
1 27 90 72 60 45
1.5 40.5 135 108 90 68
2 54 180 144 120 90
3 81 270 216 180 135

How to work it out yourself

  1. Find the volume in cubic feet. For a slab, length × width × thickness, all in feet. For a round tube, 3.1416 × (diameter in inches ÷ 24)² × height in feet.
  2. Divide by 27 if you want cubic yards.
  3. Divide cubic feet by the bag yield and round up.
  4. Add 5 to 10% for spills, uneven holes and the bag that splits.

Example: six 12 inch Sonotubes, 4 ft each. One tube holds 3.14 cu ft, six hold 18.85 cu ft (0.70 cu yd). With 10% waste that is 20.73 cu ft, so 35 bags of 80 lb. Open this example in the calculator.

When a truck makes more sense

At 45 bags, one yard of bagged concrete is 3,600 lb of dry mix, more than a full pallet of 80 lb bags (42 per pallet, see bags on a pallet). It is also a long day with a mixer.

Ready-mix suppliers usually sell by the quarter or half yard, with a minimum order and a short-load fee for small jobs. A rough guide:

  • Under about half a yard: bags almost always win.
  • Half a yard to a yard and a half: price both, including the fee.
  • Over a yard and a half: a truck usually wins on cost and on your back, if it can reach the pour.

Enter your bag price, the yard price and the short-load fee in step 3 of the calculator and it tells you which is cheaper for your job. It rounds the truck order up to the nearest quarter yard.

Weight check

Concrete weighs about 150 lb per cubic foot wet, so a yard is around 4,000 lb. That is far beyond what most pickups are rated to carry, so plan several trips or delivery if you buy a yard of bags.

Bags for a small slab

Slabs are the other common bagged-concrete job. For a 4 inch thick slab, volume = length × width ÷ 3 (in cubic feet). Rounded up, no waste:

Slab, 4 in thick Concrete Cubic yards 60 lb bags 80 lb bags
4 × 4 ft landing 5.33 cu ft 0.20 12 9
8 × 8 ft pad 21.33 cu ft 0.79 48 36
10 × 10 ft pad 33.33 cu ft 1.23 75 56
12 × 12 ft pad 48.00 cu ft 1.78 107 80

Past about 8 × 8 ft, a slab is more concrete than most people want to mix by hand in one session, and a slab needs to be placed and finished before it starts to set.

Ordering ready-mix: what to ask

If the numbers point to a truck, call two or three local suppliers and ask:

  1. What is your minimum order, and do you sell by the quarter yard?
  2. What is the short-load fee below a full load?
  3. How much time do I get to unload before extra charges start?
  4. Can the truck reach the pour, or do I need a wheelbarrow crew or a pump?
  5. What strength mix do you recommend for footings, and does my plan call for one?

Give them the volume from the calculator with waste included, rounded up to the next quarter yard.

Common mistakes

  • Forgetting waste. Holes are rarely perfect cylinders. 5 to 10% extra covers it.
  • Mixing yields. Fast-setting and high-strength mixes can list a different yield than standard mix. Use the number on the bag you buy.
  • Rounding too early. Work out the whole job in cubic feet, then convert to bags once, so small roundings do not add up.
  • Buying the exact count. One split bag leaves a footing short. Buy one or two spare and return them unopened if the store allows it.

Going the other way: bags to yards

If you already have bags and want to know how much concrete they make, multiply by the yield and divide by 27. Thirty 80 lb bags make 18 cu ft, which is two thirds of a yard. Thirty 60 lb bags make 13.5 cu ft, half a yard. Fifty 40 lb bags make 15 cu ft, about 0.56 yards. This is handy when you have leftover bags from an earlier job and want to know whether they cover the next one.

More on bag sizes: 40 vs 50 vs 60 vs 80 lb bags and how many cubic feet in an 80 lb bag.

Frequently asked questions

How many 80 lb bags of concrete make a yard?

45. One cubic yard is 27 cu ft, and each 80 lb bag of standard concrete mix yields about 0.60 cu ft. Buy 48 to 50 to cover waste.

How many 60 lb bags of concrete are in a yard?

60 bags. A 60 lb bag yields about 0.45 cu ft, and 27 ÷ 0.45 = 60.

Is it cheaper to buy bags or ready-mix for one yard?

It depends on local prices and delivery fees. Around one yard the two are often close once a short-load fee is added. Put both prices into the calculator to compare.

How much does a yard of concrete weigh?

About 4,000 lb (2 tons) wet, at roughly 150 lb per cubic foot.

Figures are typical US values for planning. Building codes, product specs and local prices vary, so confirm with your local building department, the product label and your plans or engineer. See how we write and check our guides.