A pallet of bagged concrete is a fixed weight, so the bag count depends on bag size. Quikrete’s listing for its standard concrete mix gives 42 bags of 80 lb, 56 bags of 60 lb and 80 bags of 40 lb per pallet. Other brands and stores can differ, so confirm before you order. To see how many bags your job needs, use the Sonotube concrete calculator.
Bags, weight and volume per pallet
| Bag size | Bags per pallet | Pallet weight (bags only) | Concrete per pallet |
|---|---|---|---|
| 40 lb | 80 | 3,200 lb | 24.0 cu ft |
| 60 lb | 56 | 3,360 lb | 25.2 cu ft |
| 80 lb | 42 | 3,360 lb | 25.2 cu ft |
Volume uses the yields printed for standard concrete mix: 0.30 cu ft per 40 lb bag, 0.45 per 60 lb and 0.60 per 80 lb. A pallet is a little under one cubic yard (27 cu ft). For a full yard, see how many bags of concrete in a yard.
How many Sonotubes one pallet fills
One pallet of 80 lb bags (25.2 cu ft), no waste:
| Tube | Concrete per 4 ft tube | Tubes per pallet |
|---|---|---|
| 8 in | 1.40 cu ft | 18 |
| 10 in | 2.18 cu ft | 11 |
| 12 in | 3.14 cu ft | 8 |
| 16 in | 5.59 cu ft | 4 |
| 18 in | 7.07 cu ft | 3 |
Eight 12 inch tubes at 4 ft hold 25.13 cu ft, which is 42 bags of 80 lb with no waste: the whole pallet, with nothing left for spills. Add 10% and you need 47 bags. Run that job in the calculator and set your waste allowance.
Getting a pallet home
At about 3,360 lb, a full pallet is far over the payload most pickups are rated for. Options:
- Store delivery. Usually a flat fee, and the driver can often drop the pallet near the work.
- Several trips. Split the load to stay under your truck’s rated payload, printed on the door jamb sticker.
- Rent a trailer. Check the trailer rating and your tow rating.
Pallet or loose bags?
Stores often sell full pallets at the same per-bag price as loose bags, but some offer a pallet discount or charge a refundable pallet deposit. Ask at the pro desk. Unopened bags keep for a while if they stay dry and off the ground, so a few extra is cheap insurance. Bags that got wet and hardened are waste.
Check your count
- Work out the job volume, including bells and pads.
- Add 5 to 10% for waste.
- Divide by the yield of your bag size and round up.
- Divide by the bags per pallet to see how many pallets that is.
Example: planning a 10-footing deck
Ten 12 inch footings, 4 ft each, with 10% waste:
| Step | Result |
|---|---|
| Concrete | 34.56 cu ft (1.28 cu yd) |
| 80 lb bags | 58 |
| Pallets of 80 lb | 1 full pallet (42) + 16 loose bags |
| Weight of the bags | about 4,640 lb |
| 60 lb bags instead | 77 (1 pallet of 56 + 21) |
At this size, a small ready-mix load is worth pricing too. Run this job in the calculator and enter both prices.
Storing a pallet on site
- Keep it off the ground on the pallet, and cover it with a tarp. Bags absorb moisture from the air and the ground.
- Store it close to where you will mix, but not where the truck needs to drive.
- Use the oldest bags first if you have leftovers from an earlier job.
- Throw out any bag with hard lumps you cannot break with your fingers.
How long a pallet takes to mix
A small electric mixer can usually handle one or two 80 lb bags per batch. At a few minutes per batch plus loading and pouring, a full pallet of 42 bags is a solid day for two people. A rented towable mixer moves faster, and a ready-mix truck faster still.
Returning unused bags
Many stores take back unopened, dry bags with a receipt. Ask before you buy, and keep the extras dry so they can go back.
Pallets for other jobs
Using 80 lb bags at 42 per pallet, no waste added:
| Job | 80 lb bags | Pallets |
|---|---|---|
| 8 × 8 ft pad, 4 in thick | 36 | Less than 1 |
| 10 × 10 ft pad, 4 in thick | 56 | 1 pallet + 14 bags |
| 12 × 12 ft pad, 4 in thick | 80 | 1 pallet + 38 bags |
| 6 deck footings, 12 in × 4 ft (with 10% waste) | 35 | Less than 1 |
| 12 piers, 10 in × 3 ft (with 10% waste) | 36 | Less than 1 |
Loading a pickup safely
Find the payload rating on the sticker inside the driver’s door. Subtract the weight of the people in the cab, and what is left is how much concrete you can carry. Spread bags over the axle rather than at the tailgate, and strap them so they cannot slide. If the payload left is, for example, 1,200 lb, that is 15 bags of 80 lb per trip, so a 35-bag job takes three trips. Delivery is often worth the fee.
Quick answers
- 80 lb: 42 bags, 3,360 lb, about 25.2 cu ft per pallet (Quikrete standard concrete mix).
- 60 lb: 56 bags, 3,360 lb, about 25.2 cu ft.
- 40 lb: 80 bags, 3,200 lb, about 24 cu ft.
- A pallet is a little under one cubic yard.
- Other brands and stores can differ, so confirm before ordering.
For more on bag sizes, read 40 vs 50 vs 60 vs 80 lb bags.