The joint between a deck post and its footing has two jobs: carry the load down, and stop the post from sliding or lifting off. The IRC calls the second part lateral restraint. Before you get to this step, the footings themselves need the right amount of concrete. The Sonotube concrete calculator handles that.
What the IRC requires
Section R507.4.1 of the 2021 IRC says that where posts bear on concrete footings, lateral restraint must come from manufactured connectors or from at least 12 inches of post embedment in the surrounding soil or concrete pier. Where soils are expansive or otherwise questionable, the soil cannot be counted on for lateral support. Local codes may add rules, so check your deck handout.
Three ways to attach the post
| Method | How it works | When to use it |
|---|---|---|
| Wet-set post base | The base has a leg or strap you push into fresh concrete | Best when you pour and set the anchor the same day |
| J-bolt plus post base | Set a J-bolt in the wet concrete; bolt an adjustable base to it later | When post positions may shift slightly, since adjustable bases slide a little |
| Retrofit anchor | Drill into cured concrete, set a wedge or adhesive anchor, bolt on the base | Existing footings, or when the anchor was forgotten |
All three use a galvanized or stainless post base sized for the post (4x4, 6x6). Use fasteners rated for treated lumber.
Placing the anchor in a fresh footing
- Before pouring, run a string line along the beam’s centerline and mark the post centers.
- Fill the tube, rod out the air and strike the top flat.
- Push the wet-set base or J-bolt into the center, using the string line to keep it in line with the beam.
- Check that the base is square to the beam line, plumb and at the right height. Tap the concrete around it to close voids.
- Leave it alone until the concrete has set.
The anchor needs concrete around it on every side. That is one reason 10 or 12 inch tubes are popular for 6x6 posts even when an 8 inch tube would fit: see what size Sonotube for a 6x6 post.
Retrofit anchors in cured concrete
- Use the anchor size and embedment the post base maker lists for that base.
- Keep the hole away from the edge of the pier. Small piers can crack if an expansion anchor sits too close to the edge; adhesive anchors are gentler.
- Blow the dust out of the hole before setting the anchor.
Mistakes to avoid
- Anchor off center, so the post overhangs the pier.
- Base twisted relative to the beam, so the post does not line up.
- Bare post on bare concrete with nothing holding it.
- Non-rated fasteners in treated lumber, which corrode.
Choosing a post base
Most post bases are galvanized steel and come in three common styles:
- Wet-set bases have a leg or strap that goes into fresh concrete. They are cheap and strong but leave no room to adjust.
- Adjustable bases bolt to an anchor bolt through a slotted hole, so you can slide the base a little to line up the post.
- Retrofit bases bolt down to cured concrete with a separate anchor.
Match the base to your post size (a 6x6 base for a 6x6 post) and check that its rated capacity suits your deck. Many bases include a small standoff that lifts the post end above the concrete.
Lining up a row of posts
Posts that are off line make the beam twist or overhang a post. Before you pour:
- Run a string line along the outside face or the centerline of the beam, from one end post to the other.
- Mark each post position on the string with tape.
- As you set each base, measure from the string to the base on both sides so it is centered and square to the line.
- Check the spacing between bases against the plan.
Example: six footings for a deck
A deck with six 12 inch footings, 4 ft each, takes 20.73 cu ft of concrete with 10% waste, which is 35 bags of 80 lb mix, plus six post bases and their anchors. Open the example.
Posts embedded in concrete
The IRC allows 12 inches of post embedment as lateral restraint. If you go this way, use posts rated for ground contact, and shape the top of the concrete so water runs away from the wood. Many builders avoid it because the post can rot at the point where it enters the concrete, and the post is hard to replace later.
Height adjustment
Post bases set the bottom of the post. The beam height is set by cutting the post to length after the bases are in. Measure each post from its base to the string or laser line for the beam, since footing tops are rarely all at exactly the same height.
Corrosion and treated lumber
Preservative-treated lumber is corrosive to plain steel. Use post bases and fasteners with the coating or material the maker rates for treated lumber, usually hot-dip galvanized or stainless steel, and do not mix a stainless fastener with a galvanized base unless the maker allows it. Near salt water, stainless is often the better choice.
Quick checklist
- Base sized for the post and rated for treated lumber.
- Base centered on the pier, with concrete around the anchor on all sides.
- Base square to the beam line and at the planned spacing.
- Every fastener hole filled with the specified fastener.
- Post end lifted off the concrete so it can dry.
- Top of the pier sloped so water runs off.
The full footing layout, from soil to anchor, is in Sonotube footing detail.