Skip to content

Sonotube Footing Detail: Rebar, Anchor Bolt and Bell Base

By Updated 5 min read

Line drawing illustrating sonotube footing detail

Quick answer

A Sonotube footing is a round concrete column poured in a cardboard form tube. It sits on undisturbed soil below the frost line, often on a wider bell or pad, with rebar up the middle where the plan calls for it and a post anchor set in the top. A 12 inch tube with 4 ft of concrete takes 6 bags of 80 lb mix.

Typical deck tube
10 to 12 in
Minimum depth (IRC)
12 in below grade
12 in × 4 ft
3.14 cu ft

A Sonotube footing has five parts: the soil it sits on, the base, the tube, the steel and the post connection. Each one changes how much concrete you buy and whether the footing passes inspection. If you only need the numbers, the Sonotube concrete calculator adds the tube and the bell for you.

The parts, bottom to top

Part What it does Typical spec on a deck
Undisturbed soil Carries the load Below the frost line, never on loose backfill
Bell or pad (optional) Spreads the load over a wider area Bell 18 to 24 in wide, or a square pad 6 to 12 in thick
Form tube Shapes the concrete column 8 to 12 in diameter for most decks
Rebar (if required) Holds the column together and ties it to the base 2 to 4 vertical bars
Post anchor Holds the post in place and keeps its end dry Galvanized post base, wet set or anchored later

Depth: frost line and the 12 inch minimum

The 2021 IRC deck rules (Section R507.3.2) put the bottom of a deck footing at least 12 inches below the undisturbed ground surface. Where the deck is attached to a house with a frost-protected foundation, Section R507.3.3 adds that the footing must also be protected from frost, usually by going below the local frost line. Minnesota, for example, sets 42 or 60 inches depending on the zone. Read frost line depth for how to find your number.

Base: straight tube, bell or pad

A straight tube bears only on its own circle. A 12 inch tube has about 0.79 sq ft of bearing area, and the IRC deck footing table often asks for more. For example, the 2021 table as adopted in Washington State lists a 21 inch round footing for a post carrying 60 sq ft of deck on 2,000 psf soil. You can reach that size two ways:

  • Bell base. A plastic flared form fits the bottom of the tube. A bell that flares from 12 to 24 inches over 12 inches of height adds about 1.83 cu ft of concrete per footing, roughly 3 extra bags of 80 lb mix.
  • Square pad. Pour a pad first, then set the tube on it. A 24 × 24 × 8 inch pad adds 2.67 cu ft.

Pick “Bell” or “Square pad” for each tube set in the calculator and it adds the volume. The deck footing size chart shows how to find the size you need.

Rebar

Plain concrete is strong in compression, which is most of what a deck footing sees. That is why the IRC deck table lists minimum thicknesses for plain concrete footings. Rebar still shows up on many plans:

  • Tall piers that stand well above grade, where side loads bend the column.
  • Footings with a separate pad or bell, where bars tie the column to the base.
  • Jurisdictions and engineers who simply require it.

A common layout is two to four vertical bars held a couple of inches in from the tube wall so concrete covers them. Check your approved plan before you cut steel.

Post connection

The IRC (R507.4.1) asks for lateral restraint where a post bears on a concrete footing: either a manufactured connector or at least 12 inches of post embedment in the soil or pier. Most builders use a galvanized post base set into the top of the wet concrete, which also lifts the end of the post off the concrete so it can dry. The full detail is in how to attach a deck post to a concrete footing.

Concrete for the whole footing

Add the tube and the base, then add waste for the job:

Footing Concrete per footing 80 lb bags
10 in tube × 4 ft 2.18 cu ft 4
12 in tube × 4 ft 3.14 cu ft 6
12 in tube × 4 ft + bell 12 to 24 in, 12 in tall 4.97 cu ft 9
12 in tube × 4 ft + 24 × 24 × 8 in pad 5.81 cu ft 10

Bag counts are rounded up for one footing with no waste. For a set of footings, enter them all in the calculator and add 10%.

Common mistakes

  • Setting the bottom on backfill next to the house foundation instead of undisturbed soil.
  • Forgetting the bell when buying bags, then running short mid-pour.
  • Letting the tube float or tilt. Backfill around it and brace it before you pour.
  • Setting the anchor off center so the post overhangs the pier.

Worked example: footings for a 12 × 16 ft deck

A deck 16 ft wide is attached to the house, with joists spanning 12 ft to a beam and a 1 ft overhang. The beam sits on three posts, 8 ft apart, on 2,000 psf soil.

  1. Tributary areas. The middle post carries (12 ÷ 2 + 1) × 8 = 56 sq ft. Each end post carries 7 × 4 = 28 sq ft.
  2. Footing sizes. From the table in the deck footing size chart, 56 sq ft needs about 20 inches round and 28 sq ft about 15 inches.
  3. Detail. Each footing gets a 12 inch tube with 3 ft of concrete and a 12 inch tall bell: one bell to 20 inches in the middle, bells to 16 inches at the ends.
  4. Concrete. The middle footing holds 3.78 cu ft and each end footing 3.43 cu ft. With 10% waste the job needs 11.71 cu ft, or 20 bags of 80 lb mix.

Open this deck in the calculator. It lists the two tube sets separately and adds the bells.

What the inspector looks at

  • Hole depth, measured from undisturbed ground to the bottom of the hole or bell.
  • The soil at the bottom: firm and undisturbed, no loose fill.
  • Footing width matching the approved plan, including bells or pads.
  • Rebar placement where the plan shows it.
  • Post anchor type, often checked at the framing inspection.

Have the approved plan on site and leave the holes open until the footing inspection passes.

The full sequence from layout to stripping the tube is in how to pour deck footings with a Sonotube.

Frequently asked questions

Does a Sonotube footing need a wider base?

Only if the load needs more bearing area than the tube gives. Many deck plans use a bell or a poured pad so a 10 or 12 inch tube can sit on a footing as wide as the code table asks for. Your plans or your building department decide.

Do you need rebar in a Sonotube?

The IRC deck table gives sizes for plain concrete footings, so rebar is not always required. Many local codes, engineers and inspectors still ask for it, especially in tall piers. Follow your approved plan.

How far should a Sonotube stick out of the ground?

Usually 2 to 6 inches, enough to shed water away from the post base and keep wood off the soil. Count that part as concrete height when you buy bags.

What holds the post to a Sonotube footing?

Usually a metal post base set in the wet concrete or anchored into it later. The IRC allows lateral restraint from a manufactured connector or from at least 12 inches of post embedment.

Figures are typical US values for planning. Building codes, product specs and local prices vary, so confirm with your local building department, the product label and your plans or engineer. See how we write and check our guides.