Skip to content

Can You Pour Dry Concrete in a Post Hole? (and How Long to Set)

By Updated 4 min read

Line drawing illustrating can you pour dry concrete in a post hole

Quick answer

Yes, with fast-setting concrete mix: Quikrete's instructions say to pour it dry into the hole and soak it with water, and it sets hard in about 20 to 40 minutes. Regular concrete mix is meant to be mixed with water first; poured dry, it may not get enough water everywhere. For structural deck footings, mix the concrete.

Fast-setting set time
≈20 to 40 min
Dry pour
Fast-setting only
Deck footings
Mix first

The short answer depends on the bag. Fast-setting concrete mix is made for dry pouring into post holes. Regular concrete mix is meant to be mixed first. Either way, find the number of bags first with the chart in how many bags of concrete per fence post or the Sonotube concrete calculator.

Fast-setting mix: pour dry, then water

Quikrete markets its Fast-Setting Concrete Mix for setting posts without mixing. The instructions are to pour the dry mix into the hole around the post and soak it with water. The company says it sets hard in approximately 20 to 40 minutes, and its support answers advise following each bag with water so the mix hydrates properly.

How to do it:

  1. Dig the hole and set the post. Add a few inches of gravel at the bottom if you use it for drainage.
  2. Brace the post plumb.
  3. Pour a bag of fast-setting mix into the hole.
  4. Add water until it soaks into the mix. Follow the amount and method printed on your bag.
  5. Repeat for the next bag until you reach the top, then slope the top away from the post.
  6. Check plumb right away. You have only a few minutes before it stiffens.

Regular concrete mix: mix it first

Standard concrete mix is designed to be mixed with water before placing. Quikrete’s data sheet for its concrete mix gives a starting amount of about 6 pints (3 quarts) of water per 80 lb bag. Poured dry, the water may not reach every part of the mix, especially in a deep hole, and you cannot see the dry pockets.

Mixing takes a wheelbarrow and a hoe, but it gives you more working time to line up a row of posts.

Which should you use?

Use Fast-setting, dry poured Regular mix, mixed first
Fence and mailbox posts Good fit Works, more effort
Deck footings in form tubes Not recommended Standard practice
Working time Minutes Longer
Bag size you usually find 50 lb 60 and 80 lb
Bags per 4x4 post (10 in hole, 2 ft) 3 × 50 lb 2 × 80 lb

How long before you can hang the fence?

Fast-setting mix is hard enough to stop holding the post in under an hour. Before heavy loads, such as hanging a gate or stretching wire, follow the wait time on the bag. Regular concrete mix needs longer, and cold weather slows any mix down.

Water in the hole

Step by step: setting a post with mixed concrete

When you use regular concrete mix, or want more control with fast-setting mix:

  1. Dig and prepare. Dig the hole to depth, add and tamp a few inches of gravel if you use it, and set the post.
  2. Brace. Plumb the post on two faces and hold it with two stakes and boards.
  3. Mix. In a wheelbarrow, mix one bag at a time with water until it is like thick oatmeal. Quikrete’s data sheet starts at about 3 quarts per 80 lb bag of its concrete mix.
  4. Fill. Shovel the concrete around the post, poking it with a stick or bar to settle it and remove air.
  5. Shape the top. Finish just below or at grade, sloped away from the post.
  6. Recheck. Check plumb and alignment before the mix stiffens.
  7. Wait. Leave the braces on until the concrete has hardened, then load the post only after the time on the bag.

Dry pour mistakes

  • Not enough water. The water has to reach the bottom of the hole. Add it in stages, as each bag goes in, rather than all at the end.
  • Using regular mix dry. Standard concrete mix is designed to be mixed first. Dry pouring it can leave pockets that never hydrate.
  • Pouring into standing water. Extra water weakens the concrete. Bail the hole first.
  • Forgetting to brace. Fast-setting mix stiffens in minutes. A post that leans at that point stays leaning.
  • Mounding at the top. A dome of concrete against the wood traps water. Slope it away instead.

Cold and hot weather

Cold slows any concrete down, and fresh concrete that freezes can be damaged. In cold weather, follow the temperature limits on the bag and expect longer set times. In hot, dry weather, fast-setting mix stiffens even faster, so have everything ready before you add water.

Bags per post at a glance

For a 4x4 post in a 10 inch hole with 2 ft of concrete (0.92 cu ft):

Mix Bag Bags per post
Fast-setting 50 lb 3
Standard 60 lb 3
Standard 80 lb 2

For other hole sizes, see the full chart in bags of concrete per fence post.

Fast-setting mix in deck footings

Fast-setting mix can be mixed and poured into form tubes like regular mix, but it stiffens within minutes. That leaves little time to rod out air, set an anchor and line it up. For a row of deck footings, standard concrete mix gives you the working time to do each step properly. Save fast-setting mix for fence posts, mailbox posts and small repairs.

Quick answers

  • Dry pour with fast-setting mix: yes, it is made for it. Add water as each bag goes in.
  • Dry pour with regular mix: not recommended. Mix it first.
  • Set time for fast-setting mix: about 20 to 40 minutes, per Quikrete.
  • Standing water in the hole: bail it out first.
  • Deck footings: mix the concrete.

Bottom line

Dry pour is fine for fence posts with fast-setting mix. Everything structural gets mixed concrete.

If groundwater fills the hole, bail or pump it out before you pour. A little moisture is fine, but standing water adds to the mix water and weakens the concrete.

Frequently asked questions

How long does concrete take to set in a post hole?

Fast-setting mix sets hard in about 20 to 40 minutes, according to Quikrete. Regular concrete mix takes much longer; follow the bag before loading the post.

Can I pour concrete into a post hole full of water?

Bail out standing water first. Extra water dilutes the mix and weakens it. A damp hole is fine.

How much water do I add when pouring dry fast-setting mix?

Follow the bag. The usual method is to add the dry mix, then water until it soaks through. Quikrete advises following each bag with water so every layer gets wet.

Is dry-pouring concrete OK for deck posts?

For structural deck footings, mix the concrete. A dry pour risks dry pockets you cannot see, and inspectors expect mixed concrete in footings.

Figures are typical US values for planning. Building codes, product specs and local prices vary, so confirm with your local building department, the product label and your plans or engineer. See how we write and check our guides.