A concrete pier foundation carries a building on a grid of round concrete columns instead of a continuous wall or slab. Beams run across the tops of the piers and the floor frame sits on the beams. It is the standard way to put a deck, shed, porch or small cabin on uneven ground. The Sonotube concrete calculator handles the concrete for any number of piers.
Pier, footing or pier and beam?
- Footing: the wide base that spreads load into the soil.
- Pier: the column that rises from the footing to the beam.
- Pier and beam foundation: the whole system of piers plus beams. Often used for houses in the South, and for the small buildings this guide covers.
On small projects the footing and pier are often one pour: a form tube with or without a bell at the bottom.
Step 1: lay out the grid
Decide where the beams go, then put a pier under each beam at a spacing the beam can span. For a 12 × 16 ft shed with three beams running the 16 ft length:
- Beams at 0, 6 and 12 ft across the width.
- Piers every 8 ft along each beam: at 0, 8 and 16 ft.
- That is 3 × 3 = 9 piers.
The beam size decides the spacing. Check a span table for your beam lumber and load, or follow the shed or deck plan you are using.
Step 2: size and depth
Pier size depends on the load each pier carries and on the soil, the same way deck footings are sized. The deck footing size chart shows the method. Depth comes from your local frost line plus any minimum your code sets. See frost line depth.
Step 3: concrete for the whole foundation
For the 9-pier shed with 10 inch tubes and 3 ft of concrete each (including a few inches above grade):
| Item | Amount |
|---|---|
| One pier | 1.64 cu ft |
| Nine piers | 14.73 cu ft |
| With 10% waste | 16.20 cu ft (0.60 cu yd) |
| 80 lb bags | 27 |
| 60 lb bags | 36 |
The calculator rounds per job, so you can open this layout and change the size, depth or count. Using 12 inch tubes for the same layout takes about 39 bags of 80 lb.
Step 4: build it
- Mark the grid with batter boards and string. Measure the diagonals to square it.
- Dig each hole a few inches wider than the tube, down to firm soil below the frost line.
- Set the tubes, check them for plumb, and backfill around them so they cannot move.
- Set the tops to height. A laser or water level gets them all in one plane, or plan to set post bases at different heights.
- Pour, set anchors in the center of each pier, and let the concrete cure before loading it.
Pier foundation or something else?
| Option | Good for | Not good for |
|---|---|---|
| Poured piers in form tubes | Sloped sites, frost areas, permitted decks and cabins | Very soft soil without engineering |
| Precast pier blocks on grade | Small freestanding decks and sheds where frost is not a concern | Attached decks, frost areas |
| Helical piers | Poor soil, fast installs, no concrete | Tight budgets; needs an installer |
| Slab on grade | Garages, workshops that need a concrete floor | Steep slopes |
Piers and bags for common shed sizes
Example layouts with 10 inch piers, 3 ft of concrete each, 10% waste. Your beam sizes and spacing may change the pier count.
| Shed | Example layout | Piers | Concrete | 80 lb bags | 60 lb bags |
|---|---|---|---|---|---|
| 8 × 10 ft | 2 beams, 3 piers each | 6 | 10.80 cu ft | 18 | 24 |
| 10 × 12 ft | 2 beams, 3 piers each | 6 | 10.80 cu ft | 18 | 24 |
| 12 × 16 ft | 3 beams, 3 piers each | 9 | 16.20 cu ft | 27 | 36 |
| 12 × 20 ft | 3 beams, 4 piers each | 12 | 21.60 cu ft | 36 | 48 |
Getting the pier tops level
A pier foundation only works if the beams sit level, and there are two ways to get there:
- Pour all piers to the same height. Set a string line or laser at the finished height, mark each tube, cut it to that mark, and fill to the top. This takes care at the setup stage and saves work later.
- Pour roughly, adjust with posts. Pour the piers a little low, then cut short posts on top of each to bring the beams level. This is common on sloped sites, where piers on the downhill side need taller posts.
Either way, set the post bases or anchors in line with the beam before the concrete stiffens.
Mistakes to avoid
- Piers on topsoil or fill instead of firm, undisturbed soil.
- Spacing set by convenience rather than by what the beams can span.
- Anchors set off the beam line, so the beam overhangs one side of the pier.
- No plan for drainage, so water ponds around the piers under the building.
Permits and inspection
Sheds under a local size limit are often exempt from permits, while decks, cabins and larger sheds usually are not. Where a permit is needed, expect a footing inspection with holes dug and tubes set, before you pour. Ask the building department what size triggers a permit and whether they want to see pier depth.
The full comparison for decks is in deck footing options, and the limits of precast blocks are in concrete pier blocks for decks.