Deck Footing Options: Sonotube vs Pier Blocks vs Helical Piers

By Updated 4 min read

Line drawing illustrating deck footing options

Quick answer

Poured concrete footings in form tubes are the default for permitted decks: cheap in materials, accepted everywhere, and able to go below the frost line. Precast pier blocks only suit small, low, freestanding decks. Helical piers and ground screws skip the concrete and the wait but need an installer or rental gear and approval from your inspector.

Most accepted
Poured footings
Pier blocks limit (IRC)
≤200 sq ft, freestanding
Concrete per 12 in × 4 ft
6 × 80 lb bags

Every deck needs something between the frame and the soil. The four common choices differ in cost, labor and where the code allows them. If you choose poured footings, the Sonotube concrete calculator prices the concrete.

The four options at a glance

Compare Poured footing in a form tube Precast pier block Helical pier Ground screw
What it is Concrete column poured in a cardboard or plastic tube Concrete block set on the ground Steel shaft with helix plates, torqued into the soil Threaded steel post driven in by hand or machine
Below frost line Yes No Yes Depends on length
Code acceptance Everywhere Only small freestanding decks under the IRC exception Usually, with manufacturer data Varies; ask first
Labor Dig, set, mix, pour, wait Level and place Installer with a machine Rental driver or installer
Wait before building Concrete cure None None None
Works on poor soil With a bigger base Poorly Yes, rated by installation torque Varies

Poured footings in form tubes

This is the default because it handles any frost depth and every inspector knows it. Material cost is mostly bags of concrete and the tubes. Six 12 inch footings at 4 ft take 35 bags of 80 lb mix with 10% waste. The downside is labor: digging, mixing and waiting for the concrete to cure. See Sonotube footing detail and how to pour deck footings.

Precast pier blocks

Pier blocks sit on the surface or in a shallow bed of gravel. The 2021 IRC lets you skip footings only for freestanding decks of 200 sq ft or less, with joists bearing directly on precast pier blocks at grade (no posts or beams), and a walking surface no more than 20 inches above grade within 36 inches of the edge. Outside that, most inspectors will not accept them. More in concrete pier blocks for decks.

Helical piers

A helical pier is a steel shaft with one or more helix plates, turned into the ground by a machine until it reaches a set torque. That torque gives the load capacity. Helical piers go below the frost line, work on soft soil, and you can build on them the same day. They cost more than concrete for a typical deck and need an installer. Inspectors usually accept them as an approved structural system if you provide the manufacturer’s data.

Ground screws

Ground screws look like giant lag screws with a post bracket on top. They are fast and leave no concrete in the yard. Acceptance for decks varies widely, so get approval first and ask what documentation the inspector wants.

How to choose

  1. Attached deck in a frost area? Poured footings or helical piers.
  2. Small, low, freestanding deck that meets the exception? Pier blocks can work.
  3. Poor or wet soil? Helical piers, or poured footings with an engineer’s design.
  4. Lowest cash cost and you have time? Poured footings with bagged concrete.

Cost check for poured footings

Comparing cost the right way

Comparing the price of one item is misleading. Compare the full cost per footing:

Cost item Poured footing Pier block Helical pier
Material Concrete, tube, post base Block, gravel Pier and bracket
Tools Digger, mixer Shovel, level Installer’s machine
Labor Dig, set, pour, wait Level and place Installer, quick
Hidden costs Hauling spoil, waiting for cure Rework if not allowed Minimum job charge

For poured footings, the calculator gives the concrete cost. Add the tubes and post bases from your store’s prices, then compare with a helical pier quote that includes installation.

Questions to ask your inspector

  1. Which footing systems do you accept for an attached deck?
  2. What documents do you need for helical piers or ground screws?
  3. Do you accept precast pier blocks for a freestanding deck under 200 sq ft?
  4. What frost depth applies?

Sloped yards

On a slope, poured footings in form tubes handle the height change easily: the downhill tubes are simply longer, or posts above them are taller. Helical piers also work well because the installer sets each one to depth regardless of the grade. Pier blocks on a slope need a lot of leveling and rarely meet the exception’s height limit on the downhill side.

Frost and freestanding decks

Footing choice also depends on whether the deck is attached. Under the base 2021 IRC, frost protection (R507.3.3) applies when the deck is attached to a frost-protected structure, because the house does not move with the frost and the deck would. A freestanding deck can move a little without damage, which is why the code allows pier blocks for small low ones. Many jurisdictions still require frost-depth footings for every deck, so check.

Removability

Pier blocks and ground screws can be removed when a deck comes out. Helical piers can sometimes be backed out by the installer. Poured concrete footings stay in the ground unless you dig them out, which matters if you might move or rebuild the deck later.

Quick answers

  • Most widely accepted: poured concrete footings in form tubes.
  • Fastest to build on: helical piers and ground screws, with no cure time.
  • Cheapest for a small freestanding deck: precast pier blocks, where the code exception applies.
  • Best on poor soil: helical piers, or an engineered poured footing.

Enter your bag price in step 3 of the calculator. At $6.50 a bag, six 12 inch footings at 4 ft with 10% waste come to 35 bags, about $228 in concrete before tubes and post bases. Open that example and change the price to yours.

Frequently asked questions

What is the best footing for a deck?

For an attached deck in an area with frost, poured concrete footings below the frost line are the usual answer because every inspector accepts them. Helical piers are a strong alternative on poor soil.

Can I use deck blocks instead of footings?

Only for decks that meet your code's freestanding exception. In the 2021 IRC that means 200 sq ft or less, joists bearing directly on precast pier blocks at grade, and a walking surface no more than 20 inches above grade near the edges.

Are helical piers allowed for decks?

Often yes, as an approved structural system, but the inspector will want the manufacturer's documentation and sometimes installation records. Ask before you buy.

Which deck footing option is cheapest?

For a few footings, bagged concrete in form tubes is usually the lowest material cost. Pier blocks cost less still but only work for the decks the code exempts.

Figures are typical US values for planning. Building codes, product specs and local prices vary, so confirm with your local building department, the product label and your plans or engineer. See how we write and check our guides.