Under the 2021 IRC, deck footings must be sized from Table R507.3.1, sit at least 12 inches below undisturbed ground, be protected from frost when the deck attaches to a frost-protected house, and hold each post with a connector or 12 inches of embedment. Small, low freestanding decks on pier blocks are exempt. Local codes can add more.

Size
Table R507.3.1
Min. depth
12 in
Frost
R507.3.3

Deck footings are one of the parts inspectors look at most closely, because you cannot see or fix them once the deck is built. Here is what the 2021 IRC asks for, with the section numbers to look up in your local code. When the plan is approved, use the Sonotube concrete calculator for the concrete order.

The rules, section by section

Topic 2021 IRC section Requirement
General R507.3 Concrete footings or another approved system sized to carry the deck loads
Exceptions R507.3 No footings for freestanding decks with joists on grade, or for freestanding decks of 200 sq ft or less on precast pier blocks at grade with a walking surface no more than 20 in above grade within 36 in of the edge
Size R507.3.1 Minimum size from Table R507.3.1, by tributary area and soil bearing
Depth R507.3.2 At least 12 in below the undisturbed ground surface
Frost R507.3.3 Where attached to a frost-protected structure: below the frost line, on solid rock, or another approved method
Posts R507.4 Post size and maximum height from Table R507.4
Post connection R507.4.1 Lateral restraint by manufactured connector or at least 12 in embedment

States and towns amend these rules. The local deck handout or permit desk has the version that applies to you.

Footings near the house

The soil right next to a house foundation was dug out and backfilled when the house was built. A footing that sits in that backfill can settle. The IRC deck section does not set a distance, but inspectors watch for it, and many deck guides (including the American Wood Council’s DCA 6 prescriptive deck guide) address footings close to the house. Either keep footings out of the backfill zone or take them down to undisturbed soil, as your inspector directs.

Pre-inspection checklist

Before you call for the footing inspection:

  • Permit posted and approved plans on site
  • Holes at the approved locations and spacing
  • Bottom of each hole on undisturbed soil, clean of loose dirt
  • Depth at or below the required frost depth (and at least 12 in)
  • Bells or pads in place where the plan calls for them, sized per the plan
  • Tubes set plumb, backfilled and braced
  • Rebar in place if required
  • Post bases or anchors on site and ready to set

After the inspection

  1. Pour each footing in one session. Rod the concrete to remove air.
  2. Set post bases on the beam line while the concrete is wet.
  3. Let the concrete cure before loading the posts.
  4. Strip the cardboard above grade once it has hardened.

The permit process for deck footings

The usual order for a residential deck permit looks like this, though every jurisdiction differs:

  1. Plan. Draw the deck with footing locations, sizes and depths, beam and joist sizes, and the ledger detail. Many towns offer a prescriptive deck handout you can follow.
  2. Apply. Submit the plan and the application, and pay the fee.
  3. Approval. The plans examiner may ask for changes, often to footing size or ledger attachment.
  4. Footing inspection. Dig the holes and call for an inspection before you pour.
  5. Framing inspection. After the frame is built and before decking hides it.
  6. Final inspection. After railings, stairs and the rest are done.

Common reasons footing inspections fail

  • Holes shallower than the frost depth on the plan.
  • Loose soil or water in the bottom of the hole.
  • Footings smaller than the approved size, or bells missing.
  • Footing locations that do not match the plan.
  • Footings sitting in backfill next to the house foundation.

Most of these are quick to fix while the holes are still open, which is the point of inspecting before the pour.

Documents to have on site

  • The approved plan and permit card
  • Product information for any post bases, bells, helical piers or ground screws
  • The concrete or footing schedule, if the plan has one

Concrete for a typical permit deck

For six 12 inch footings at 4 ft, 10% waste: 20.73 cu ft, 35 bags of 80 lb. If the plan adds bells to 24 inches, it rises to 32.83 cu ft, 55 bags. Change the numbers to match your approved plan in the calculator.

Stairs and landings

Stairs need support at the bottom too. A stair stringer usually rests on a concrete pad, a landing or its own footings. Some jurisdictions require the stair footings to meet the same depth rules as the deck; others accept a pad at grade. Show the stair support on your plan and ask, because it is a common item on correction lists.

Attached vs freestanding: quick summary

Deck Footing depth under base 2021 IRC Typical local practice
Attached to a frost-protected house At least 12 in and protected from frost Below frost line
Freestanding, not on the exception At least 12 in Often below frost line anyway
Freestanding, meets the pier block exception No footings required Check local amendments

Quick answers

  • Minimum depth: 12 inches below undisturbed ground (R507.3.2).
  • Frost: below the local frost line when the deck is attached to a frost-protected house (R507.3.3).
  • Size: from Table R507.3.1 by tributary area and soil.
  • Post connection: connector or 12 inches of embedment (R507.4.1).
  • Who decides: your local building department, using its adopted and amended code.

The step-by-step version is in how to pour deck footings with a Sonotube. For sizing, see the deck footing size chart; for depth, frost line depth.

Frequently asked questions

How deep do deck footings need to be?

At least 12 inches below undisturbed ground under the 2021 IRC, and below the local frost line where the deck attaches to a frost-protected house. Your building department sets the frost depth.

How close can a deck footing be to the house?

The IRC does not give one distance. The concern is the backfilled soil next to the foundation: a footing in that zone must still reach undisturbed soil. Ask your inspector how they want footings near the house handled.

Do deck footings need to be inspected?

In most places that issue deck permits, yes: usually after the holes are dug and before the concrete goes in. Your permit card lists the inspections.

Do freestanding decks need footings?

Not if they meet the IRC exception: 200 sq ft or less, joists bearing directly on precast pier blocks at grade, and a walking surface no more than 20 inches above grade near the edges.